Process Control and Information System for the power plant Amagerverket Unit 3

Vattenfall A/S

Process Control and Information System for the power plant Amagerverket Unit 3
The Power Plant Amagerverket unit 3 in Copenhagen will be rebuild for 100 % wood pellets. In this context the existing DCS has to be replaced. The work comprises development, engineering, production, installation and test of a integrated plant control system.
The full integrated system must include:
Process Control and Information System for controlling the boiler, flue gas system and other auxiliary systems.
Turbine control and protection system.
Boiler protection system in Fail-Safe technology.
Graphical HMI (Human Machine Interface) for multiple operators.
A common engineering platform from which the entire integrated plant control system can be engineered.
Database for logging data. The database should be accessible for other applications.

Deadline
Fristen for modtagelse af bud var på 2013-02-28. Indkøbet blev offentliggjort på 2013-01-18.

Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2013-01-18 Udbudsbekendtgørelse