Major overhaul of generator at Kyndby Power Plant unit 22
Major overhaul of a 307 MVA static excitation generator, including stator core and rotor repair. The scope includes all mechanical engineering, services and tests. The planned outage for finalizing the the scope is 5 weeks. The time period is expected to be in calendar week 36-42, 2013.
Deadline
Fristen for modtagelse af bud var på 2013-05-21.
Indkøbet blev offentliggjort på 2013-04-19.