The Scope of work for Kriegers Flack HVDC Plant includes design, execute and complete the following:
— HVDC-VSC Converter substation including building onshore in the Ishøj area - Denmark.
— HVDC-VSC Converter substation off-shore including offshore platform.
The transfer capability for the Kriegers Flack DC Plant shall be round 600 MW.
Extension of the DC switchgear offshore by additional disconnector bays including platform extension in a range from at least 3 up to 6 in total.
— preparation of multiterminal capability for later DC connections.

Deadline
Fristen for modtagelse af bud var på 2013-06-26. Indkøbet blev offentliggjort på 2013-06-04.