Wrapping and dehumidification of suspension bridge main cables
The works will comprise supply and installation of a main cable dehumidification system on the Great Belt East Bridge.
The 2 main cables of the East Bridge have a diameter of 0,82 m and a total length of 2 965 m each.
The works also include provision and installation of temporary access facilities on the main cables.
The contractors tender shall be based upon a detailed design provided by the client.
Deadline
Fristen for modtagelse af bud var på 2012-03-26.
Indkøbet blev offentliggjort på 2012-02-22.
Hvem?
Hvad?
Hvor?
Indkøbshistorik
Dato |
Dokument |
2012-02-22
|
Udbudsbekendtgørelse
|
2012-09-13
|
Supplerende oplysninger
|