Transport and storage equipment for a biomass co-firing plant for wood pellets
The purchase will be divided into two different lots as described in the following. These may either be ordered as two separate contracts or as one common contract.
LOT no. 1: Wood pellet receiving and transport equipment.
The supply includes a wood pellet receiving facility and transport equipment for a biomass co-firing plant for wood pellets located at Nordjyllandsværket in the city of Aalborg.
The supply includes design, manufacturing, supply, installation, testing and commissioning of a wood pellet hopper located at the existing quay for receiving wood pellets unloaded from ship by crane with a capacity of 1.200 ton/hr and a transportation system for transporting wood pellets to the storage and a transportation system for transporting wood pellets from the storage to the power plant.
The supply does not include the wood pellet storage.
The supplier shall be able to provide maintenance and support to the equipment.
LOT no. 2: Wood pellet storage:
The supply includes the mechanical part of a closed wood pellet storage facility for a biomass co-firing plant for wood pellets located at Nordjyllandsværket in the city of Aalborg.
The supply includes design, manufacturing, supply, installation, testing and commissioning of the mechanical part of a closed wood pellet storage, divided into two or more closed storages, with at total storage capacity of 50.000 m3. The supply includes mechanical discharge equipment for discharging wood pellets from the storage.
The supplier shall be able to provide maintenance and support to the equipment.
Deadline
Fristen for modtagelse af bud var på 2012-06-12.
Indkøbet blev offentliggjort på 2012-05-23.
Hvem?
Hvad?
Hvor?
Indkøbshistorik
Dato |
Dokument |
2012-05-23
|
Udbudsbekendtgørelse
|
Nye indkøb inden for beslægtede kategorier 🆕