Prequalification - supply to ensure the system stability in western Zealand DK2 and Funen DK1 - SynCon12

Energinet.dk

Energinet.dk wants to ensure the system stability in western Zealand and Funen. In order to do so, a synchronous condenser for installation at the 400 kV voltage level in Western Zealand and Funen is to be delivered and installed.
The synchronous condenser must as a minimum be able to supply a sub-transient short-circuit contribution of 700 MVA, calculated at 400 kV. The supply comprises a EPC project consisting of synchronous condenser, step-up transformer and all necessary equipment, including installation / integration.(Further interfaces will apply from the tender material) or, a solution technically corresponding to what is provided by a synchronous condenser must be supplied. The alternative solution is to be supplied on Western Zealand and on Funen. The alternative solution must be offered for a three-year period with the possibility of a two-year extension.
The intention is that all tenders can be prequalified for either one or both lot’s and can be awarded the contract for either one or both lot’s.

Deadline
Fristen for modtagelse af bud var på 2012-11-19. Indkøbet blev offentliggjort på 2012-11-02.

Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2012-11-02 Udbudsbekendtgørelse
2012-11-06 Supplerende oplysninger
Relaterede søgninger 🔍