Pre-qualification 98/12 Køge Bugt – rerouting of 132 kV transmission lines – 132 kV cable supply and cable installation
Design, manufacture, delivery, installation and commissioning of a complete 132 (145) kV transmission cable system.
The existing 132 kV overhead lines, located along the E20 motorway between Jersie and Ishøj, have to be moved due to the construction of a new railway line from Copenhagen to Ringsted. It has thus been decided to construct the transmission lines as a cable system.
Deadline
Fristen for modtagelse af bud var på 2012-03-16.
Indkøbet blev offentliggjort på 2012-02-20.
Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Hvem?
Hvad?
Hvor?
Indkøbshistorik
Dato |
Dokument |
2012-02-20
|
Udbudsbekendtgørelse
|
2013-02-22
|
Bekendtgørelse om indgåede kontrakter
|