Lot E05 Electrical supply for the construction site
The scope of supply includes design, manufacturing, supply, installation, test and commissioning of the complete electrical supply system on the construction site at Nordjyllandsværket.
This includes an electrical supply system of interconnected switchboards with circuit breakers, power cables, light poles with lights to illuminate access roads and areas of the construction site, barrier to control site access etc.
The contractor shall provide assistance on site within four (4) hours in case of damage or faults in the electrical site supply system.
Deadline
Fristen for modtagelse af bud var på 2013-01-07.
Indkøbet blev offentliggjort på 2012-11-28.
Hvem?
Hvad?
Hvor?
Indkøbshistorik
Dato |
Dokument |
2012-11-28
|
Udbudsbekendtgørelse
|