HEV steam turbine and generator major overhaul
The 89 MW BBC single cylinder steam turbine was commissioned in 1982. It operates at a live steam pressure of 115 bar at 525°C. The steam flow is 120 kg/s. It’s at back pressure turbine supplying district heating to the city of Herning. The generator is an air/water cooled BBC type wx18L-083LLT of 111 MVA/50Hz.
Deadline
Fristen for modtagelse af bud var på 2012-10-04.
Indkøbet blev offentliggjort på 2012-08-30.