Definition and implementation of a Process Safety Programme in DONG Energy Thermal Power
Due to increasing market pressure DONG Energy Thermal Power wishes to improve performance (availability), lower cost and increase safety.
DONG Energy Thermal Power wants to carry out a Process Safety Program, phase 1 which consists of the following 7 elements:
1. Process Safety Culture/awareness project for all employees, integrated with current Health and safety initiatives
2. Technical Risk Management Project where safety critical components and systems on our Power Plants are identified and adequate maintenance on critical components and systems are specified and standardised. Also included is designing and implementing of a general risk based approach to maintenance. A final part of this project is technical knowledge sharing on plant performance and the usage of engineering standards.
3. Operational procedures and shift logging project, where operational procedures are defined and implemented. Also included in this project is specification, purchase and implementation of a new operations logging system to be used for example during shift handover.
4. Project on permit to work where a new permit to work system is specified, purchased and implemented.
5. Expanding a current safety incident reporting system (Synergi) to include process safety incidents.
6. Defining an alarm and control loop philosophy.
7. Survey of the process safety culture in the organisation and PAS55 Gap analysis at the end of phase 1
The delivery put out to tender is consulting services to aid DONG Energy Thermal Power through this programme. The delivery of the IT-systems itself are not included in the delivery.
Deadline
Fristen for modtagelse af bud var på 2012-05-16.
Indkøbet blev offentliggjort på 2012-04-30.
Hvem?
Hvad?
Hvor?
Indkøbshistorik
Dato |
Dokument |
2012-04-30
|
Udbudsbekendtgørelse
|
2012-05-11
|
Supplerende oplysninger
|