The contract regards the delivery of 360 armoured personnel carriers (APCs) for replacement of the existing fleet for the entire Danish Army. During contract negotiations DALO retains the right to adjust the number of APCs to be delivered, however the number cannot exceed 450 or be less than 206, and the negative options as well as the positive options shall be adjusted accordingly, cf. section II.2.2 and the description of the positive and negative options below. I.e. should DALO choose to increase the number of APCs to be purchased, then the number of negative options shall be increased and the number of positive options shall be decreased, still leaving DALO with the option to vary the delivery between a maximum of 450 and a minimum of 206 APCs. The tender process is divided into two lots (regarding tracked APCs (lot 1) or wheelbased APCs with minimum 4 axles (lot 2)). DALO will only enter into one of the contracts (ie. either tracked or wheelbased APCs). The final decision on whether tracked or wheelbased APCs (minimum 4 axles) is preferred will be taken during the negotiation procedure (presumably after DALO has received the tenderers best and final offers). The first delivery shall be effected no later than end of 2015 and the last ordinary delivery in 2022. It is the intention that an equal number of APCs are delivered in each year. The APC shall be delivered in 6 different variants: (1) Infantry variant, (2) Command post variant, (3) Engineers variant, (4) Ambulance variant, (5) Repair variant, (6) Mortar variant. In terms of numbers the main variants are Infantry and Command Post, representing more than half of the total number while the rest is divided between the 4 other variants. Exact numbers will be stated in the acquisition contract. The APCs shall be either tracked or wheelbased. For the Infantry variant the APC shall seat no less than 10 crew and passengers and preferably up to 13 and with physical contact between crew and passengers. The APCs need to have approximately 5,5 tons free weight (ia. depending on the size of the APC and the variant). The free weight will primarily be utilized to crew, equipment, GFE, extra capacity for future developments and capacity for additional armour, cf the minimum standards below. Tenderers can offer either a tracked APC (lot 1) or a wheel based APC (lot 2) or can submit a tender for both lots (if invited to tender for both lots). As stated above DALO will only enter into one of the contracts and the selection between lot 1 and lot 2 will be taken during the negotiation process. The APCs will function in a full-spectrum operational environment from war to humanitarian missions with multiple and diverse threats presenting themselves. This demands that the APCs are flexible, highly mobile and agile in the terrain. The level of protection and armour shall be high with a minimum of level 4a/4b mine protection and level 4 ballistic protection – all according to STANAG 4569. Please note that certificates issued by a third party institute documenting this protection level shall be presented to DALO before 1.6.2013. Furthermore clearance from seat reference point to roof line shall be minimum 107 cm according to MIL-STD-1472G. The APCs shall be fully operable in climate zones INTERMEDIATE (A3), HOT DRY (A2) and MILD COLD (C0), INTERMEDIATE COLD (C1) according to STANAG 2685. The APC is expected to be in use for many years (life expectancy approximately 30 years) and future development potential in terms of weight, power supply and integration of future technologies are considered essential. Furthermore, the APCs shall comply with requirements related to occupational safety and environmental aspects. As described under II.2.2) the number of APCs to be delivered can be adjusted by DALO's use of positive options which can increase the total number of APCs to be delivered under the contract to a maximum of 450. In addition, DALO will have the possibility to take advantage of negative options which conversely will reduce the total number of APCs to a minimum of 206. The exact mechanism for DALOs use of options will be described in detail in the acquisition contract. Prior to delivery, the supplier shall install a variety of equipment that is furnished by DALO. This equipment includes remote controlled weapon stations, battle management systems, radio equipment, etc. The type of equipment will depend on the variant in question. The supplier shall have a full system responsibility. This means that the supplier maintains full responsibility for the fulfilment of the general fit for purpose obligation notwithstanding any changes, upgrades or modifications (including the changes following from installation of equipment furnished by DALO) made to the APCs by DALO or third parties of any kind. The exact terms and conditions for the supplier’s system responsibility will be described in detail in the acquisition contract. In addition to the delivery of APCs, the contract includes (1) delivery of an initial stock of spare parts for each APC, (2) Special tools and test equipment, (3) Documentation and (4) Training services. While executing the contract, the supplier shall observe relevant secrecy obligations. In addition to this contract, a separate tender procedure is initiated for a sustainment contract (framework contract) covering a variety of services, including management and maintenance services, supply of further spare parts etc. The sustainment contract is also awarded through a negotiated procedure with publication of a notice. The 2 contracts are to be seen as a whole and will be awarded to the same tenderer. Thus, it is a precondition for a tender to be taken into consideration for the award of this contract, that a tender is also submitted for the sustainment contract. Hence, all tenderes have to be selected and to submit tenders in both tender procedures.
Deadline
Fristen for modtagelse af bud var på 2012-06-25.
Indkøbet blev offentliggjort på 2012-05-25.
Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Udbudsbekendtgørelse (2012-05-25) Objekt Omfanget af udbuddet
Titel: Pansrede mandskabsvogne
Mængde eller omfang:
The contract regards the delivery of 360 APCs together with related equipment and services as described under II.1.5. However, the exact number of APCs to be delivered can vary - depending on DALO's use of positive and negative options - from a minimum of 206 up to a maximum of 450 APCs.
The contract regards the delivery of 360 APCs together with related equipment and services as described under II.1.5. However, the exact number of APCs to be delivered can vary - depending on DALO's use of positive and negative options - from a minimum of 206 up to a maximum of 450 APCs.
Bekendtgørelsens metadata
Originalsprog: engelsk 🗣️
Dokumenttype: Udbudsbekendtgørelse
Kontraktens art: Varer
Forordning: Den Europæiske Union
Fælles glossar for offentlige kontrakter (CPV)
Kode: Pansrede mandskabsvogne📦
Procedure
Procedureform: Udbud efter forhandling
Bud-type: Indsendelse gældende for én eller flere delaftaler
Kriterier for tildeling
Det økonomisk mest fordelagtige bud
Ordregivende myndighed Identitet
Land: Danmark 🇩🇰
Type af ordregivende myndighed: Ministerium eller anden myndighed på nationalt plan eller forbundsplan
Navn på ordregivende myndighed: Danish Defence Acquisition and Logistics Organization (DALO)
Postadresse: Lautrupbjerg 1-5
Postnummer: 2750
Postby: Ballerup
Kontakt
Internetadresse: http://www.forsvaret.dk/fmt🌏
E-mail: apc-r@mil.dk📧
Telefon: +45 72572248📞
Information meeting regarding pre-qualification.
DALO invites all candidates to attend a presentation meeting at DALO's premises in week 24, 2012. If interested in participating in the meeting, the candidates shall submit a request pr. e-mail to APC-R@mil.dk no later than 4.6.2012. Each candidate will be assigned a specific meeting time for the presentation and this will be submitted to the candidate pr. e-mail. Thus, the candidate should make sure when requesting to participate in the meeting to provide DALO with an e-mail address that this information can be sent to.
The meeting will last for approximately 1 hour and in the meeting, DALO will go through the pre-qualification criteria and answer any questions asked by the candidates. Anonymised questions/answers concerning the pre-qualification criteria and documents to be submitted that DALO thinks is of importance to all candidates will be e-mailed to all the candidates.
Testing of test-vehicle.
As part of the tender procedure and prior to awarding the contract, tests will be conducted on a test-vehicle to verify that the equipment included in the tenderers’ offer complies with the demands of DALO provided that the indicative offer fulfills the mandatory requirements. Furthermore, the evaluation of the offers will be based partly on the tests. In order for a submitted APC to be characterised as a "test-vehicle", the APC must - as a minimum - be based on the same hull structure, have the same driveline and the same undercarriage as the APC offered to DALO.
The tests are scheduled to take place primarily at Oksbøl in Denmark from either January 2013 or March 2013 depending on the number of candidates for test and will require each tenderer to supply one APC (infantry configuration) to DALO no later than week 3 / week 12, 2013. The tests are expected to have a duration of approx. 3-4 months. All tenderers should therefore make the necessary preparations and be aware of any export restrictions being applied in their home countries and take the necessary steps to obtain the requisite permits in time in order for the test vehicle to be in Oksbøl in week 3 / week 12, 2013. The exact time for the tests will be stated in the tender documents 10 July 2012.
Negotiations.
Negotiations will be focused on the strengths and weaknesses of the submitted tenders and will be based on the contract award criteria as well as possible reservations to the terms of the tender.
DALO reserves the right to - based on the award criteria - shortlist the candidates after the evaluation of the indicative offers (i.e. to reduce the number of candidates per lot with 1 - 2 tenderer(s) even if the tenderer(s) in question fulfils the minimum requirements). No more than 6 tenderes will be asked to participate in the tests. It does not have to be three from each lot (ie. three wheelbased and three tracked). It can for instance also be two tracked APCs and up to four wheelbased APCs.
After having conducted the negotiations, a revised set of tender documents may be submitted based on the experiences from the negotiations. Hereafter, the candidates are requested to make any alteration (if any) to the indicative offer necessitated by the negotiations and to submit either af new indicative offer that leads to further negotiations or a best and final offer (BAFO).
After receipt of the BAFO, DALO will evaluate all the best and final offers in order to identify the most economically advantageous offer, using the award criteria as further described in the tender conditions.
Re. section III.2).
A candidate may rely on the economic, financial and/or technical capacity of other entities, regardless of the legal nature of the links with the entities. If a candidate relies on other entities the candidate must prove to the contracting authority the disposal of the resources necessary for performance of the contract, for example by producing an undertaking on the part of those entities to that effect.
A candidate may, for example, rely on other entities' economic capacity, cf. clause 41(2) in Directive 2009/81/EC. If so, the candidate must provide documentation that the other entities will and shall put the relevant economic resources at the disposal of the candidate. Furthermore the candidate must provide the same type of information regarding the other entities' economic capacity as the candidate shall submit of his own economic capacity.
Re. section IV.1.2).
Should any of the prequalified candidates choose not to submit the first indicative offer and thereby leaving DALO with a very limited number of offers to evaluate, DALO reserves the right to postpone the evaluation procedure and reopen the prequalification round in order to invite one or more of the rejected candidates (depending on how many candidates that chose not to submit an indicative offer) to join the tender procedure.
Re. section IV 3.4).
Each candidate may only submit one application per lot. The application should preferably be submitted in 3 paper copies and 1 electronic copy on a CD-ROM or an equivalent medium.
The application should preferably be marked "Armoured Personnel Carriers – Confidential, att.: Lt. Col. Karsten Kolding – må ikke åbnes ved intern postfordeling". The application must be delivered in a sealed envelope to the address stated in section I.1 and may not be forwarded by e-mail.
Furthermore the candidate is requested to submit an e-mail address of a contact person to which relevant information may be forwarded.
DALO invites all candidates to attend a presentation meeting at DALO's premises in week 24, 2012. If interested in participating in the meeting, the candidates shall submit a request pr. e-mail to APC-R@mil.dk no later than 4.6.2012. Each candidate will be assigned a specific meeting time for the presentation and this will be submitted to the candidate pr. e-mail. Thus, the candidate should make sure when requesting to participate in the meeting to provide DALO with an e-mail address that this information can be sent to.
The meeting will last for approximately 1 hour and in the meeting, DALO will go through the pre-qualification criteria and answer any questions asked by the candidates. Anonymised questions/answers concerning the pre-qualification criteria and documents to be submitted that DALO thinks is of importance to all candidates will be e-mailed to all the candidates.
Testing of test-vehicle.
As part of the tender procedure and prior to awarding the contract, tests will be conducted on a test-vehicle to verify that the equipment included in the tenderers’ offer complies with the demands of DALO provided that the indicative offer fulfills the mandatory requirements. Furthermore, the evaluation of the offers will be based partly on the tests. In order for a submitted APC to be characterised as a "test-vehicle", the APC must - as a minimum - be based on the same hull structure, have the same driveline and the same undercarriage as the APC offered to DALO.
The tests are scheduled to take place primarily at Oksbøl in Denmark from either January 2013 or March 2013 depending on the number of candidates for test and will require each tenderer to supply one APC (infantry configuration) to DALO no later than week 3 / week 12, 2013. The tests are expected to have a duration of approx. 3-4 months. All tenderers should therefore make the necessary preparations and be aware of any export restrictions being applied in their home countries and take the necessary steps to obtain the requisite permits in time in order for the test vehicle to be in Oksbøl in week 3 / week 12, 2013. The exact time for the tests will be stated in the tender documents 10 July 2012.
Negotiations.
Negotiations will be focused on the strengths and weaknesses of the submitted tenders and will be based on the contract award criteria as well as possible reservations to the terms of the tender.
DALO reserves the right to - based on the award criteria - shortlist the candidates after the evaluation of the indicative offers (i.e. to reduce the number of candidates per lot with 1 - 2 tenderer(s) even if the tenderer(s) in question fulfils the minimum requirements). No more than 6 tenderes will be asked to participate in the tests. It does not have to be three from each lot (ie. three wheelbased and three tracked). It can for instance also be two tracked APCs and up to four wheelbased APCs.
After having conducted the negotiations, a revised set of tender documents may be submitted based on the experiences from the negotiations. Hereafter, the candidates are requested to make any alteration (if any) to the indicative offer necessitated by the negotiations and to submit either af new indicative offer that leads to further negotiations or a best and final offer (BAFO).
After receipt of the BAFO, DALO will evaluate all the best and final offers in order to identify the most economically advantageous offer, using the award criteria as further described in the tender conditions.
Re. section III.2).
A candidate may rely on the economic, financial and/or technical capacity of other entities, regardless of the legal nature of the links with the entities. If a candidate relies on other entities the candidate must prove to the contracting authority the disposal of the resources necessary for performance of the contract, for example by producing an undertaking on the part of those entities to that effect.
A candidate may, for example, rely on other entities' economic capacity, cf. clause 41(2) in Directive 2009/81/EC. If so, the candidate must provide documentation that the other entities will and shall put the relevant economic resources at the disposal of the candidate. Furthermore the candidate must provide the same type of information regarding the other entities' economic capacity as the candidate shall submit of his own economic capacity.
Re. section IV.1.2).
Should any of the prequalified candidates choose not to submit the first indicative offer and thereby leaving DALO with a very limited number of offers to evaluate, DALO reserves the right to postpone the evaluation procedure and reopen the prequalification round in order to invite one or more of the rejected candidates (depending on how many candidates that chose not to submit an indicative offer) to join the tender procedure.
Re. section IV 3.4).
Each candidate may only submit one application per lot. The application should preferably be submitted in 3 paper copies and 1 electronic copy on a CD-ROM or an equivalent medium.
The application should preferably be marked "Armoured Personnel Carriers – Confidential, att.: Lt. Col. Karsten Kolding – må ikke åbnes ved intern postfordeling". The application must be delivered in a sealed envelope to the address stated in section I.1 and may not be forwarded by e-mail.
Furthermore the candidate is requested to submit an e-mail address of a contact person to which relevant information may be forwarded.
Objekt Omfanget af udbuddet
Kort beskrivelse:
The contract regards the delivery of 360 armoured personnel carriers (APCs) for replacement of the existing fleet for the entire Danish Army. During contract negotiations DALO retains the right to adjust the number of APCs to be delivered, however the number cannot exceed 450 or be less than 206, and the negative options as well as the positive options shall be adjusted accordingly, cf. section II.2.2 and the description of the positive and negative options below. I.e. should DALO choose to increase the number of APCs to be purchased, then the number of negative options shall be increased and the number of positive options shall be decreased, still leaving DALO with the option to vary the delivery between a maximum of 450 and a minimum of 206 APCs.
The contract regards the delivery of 360 armoured personnel carriers (APCs) for replacement of the existing fleet for the entire Danish Army. During contract negotiations DALO retains the right to adjust the number of APCs to be delivered, however the number cannot exceed 450 or be less than 206, and the negative options as well as the positive options shall be adjusted accordingly, cf. section II.2.2 and the description of the positive and negative options below. I.e. should DALO choose to increase the number of APCs to be purchased, then the number of negative options shall be increased and the number of positive options shall be decreased, still leaving DALO with the option to vary the delivery between a maximum of 450 and a minimum of 206 APCs.
The tender process is divided into two lots (regarding tracked APCs (lot 1) or wheelbased APCs with minimum 4 axles (lot 2)). DALO will only enter into one of the contracts (ie. either tracked or wheelbased APCs). The final decision on whether tracked or wheelbased APCs (minimum 4 axles) is preferred will be taken during the negotiation procedure (presumably after DALO has received the tenderers best and final offers).
The tender process is divided into two lots (regarding tracked APCs (lot 1) or wheelbased APCs with minimum 4 axles (lot 2)). DALO will only enter into one of the contracts (ie. either tracked or wheelbased APCs). The final decision on whether tracked or wheelbased APCs (minimum 4 axles) is preferred will be taken during the negotiation procedure (presumably after DALO has received the tenderers best and final offers).
The first delivery shall be effected no later than end of 2015 and the last ordinary delivery in 2022. It is the intention that an equal number of APCs are delivered in each year.
The APC shall be delivered in 6 different variants:
(1) Infantry variant,
(2) Command post variant,
(3) Engineers variant,
(4) Ambulance variant,
(5) Repair variant,
(6) Mortar variant.
In terms of numbers the main variants are Infantry and Command Post, representing more than half of the total number while the rest is divided between the 4 other variants. Exact numbers will be stated in the acquisition contract.
The APCs shall be either tracked or wheelbased. For the Infantry variant the APC shall seat no less than 10 crew and passengers and preferably up to 13 and with physical contact between crew and passengers. The APCs need to have approximately 5,5 tons free weight (ia. depending on the size of the APC and the variant). The free weight will primarily be utilized to crew, equipment, GFE, extra capacity for future developments and capacity for additional armour, cf the minimum standards below. Tenderers can offer either a tracked APC (lot 1) or a wheel based APC (lot 2) or can submit a tender for both lots (if invited to tender for both lots). As stated above DALO will only enter into one of the contracts and the selection between lot 1 and lot 2 will be taken during the negotiation process.
The APCs shall be either tracked or wheelbased. For the Infantry variant the APC shall seat no less than 10 crew and passengers and preferably up to 13 and with physical contact between crew and passengers. The APCs need to have approximately 5,5 tons free weight (ia. depending on the size of the APC and the variant). The free weight will primarily be utilized to crew, equipment, GFE, extra capacity for future developments and capacity for additional armour, cf the minimum standards below. Tenderers can offer either a tracked APC (lot 1) or a wheel based APC (lot 2) or can submit a tender for both lots (if invited to tender for both lots). As stated above DALO will only enter into one of the contracts and the selection between lot 1 and lot 2 will be taken during the negotiation process.
The APCs will function in a full-spectrum operational environment from war to humanitarian missions with multiple and diverse threats presenting themselves. This demands that the APCs are flexible, highly mobile and agile in the terrain.
The level of protection and armour shall be high with a minimum of level 4a/4b mine protection and level 4 ballistic protection – all according to STANAG 4569. Please note that certificates issued by a third party institute documenting this protection level shall be presented to DALO before 1.6.2013. Furthermore clearance from seat reference point to roof line shall be minimum 107 cm according to MIL-STD-1472G.
The level of protection and armour shall be high with a minimum of level 4a/4b mine protection and level 4 ballistic protection – all according to STANAG 4569. Please note that certificates issued by a third party institute documenting this protection level shall be presented to DALO before 1.6.2013. Furthermore clearance from seat reference point to roof line shall be minimum 107 cm according to MIL-STD-1472G.
The APCs shall be fully operable in climate zones INTERMEDIATE (A3), HOT DRY (A2) and MILD COLD (C0), INTERMEDIATE COLD (C1) according to STANAG 2685.
The APC is expected to be in use for many years (life expectancy approximately 30 years) and future development potential in terms of weight, power supply and integration of future technologies are considered essential.
Furthermore, the APCs shall comply with requirements related to occupational safety and environmental aspects.
As described under II.2.2) the number of APCs to be delivered can be adjusted by DALO's use of positive options which can increase the total number of APCs to be delivered under the contract to a maximum of 450. In addition, DALO will have the possibility to take advantage of negative options which conversely will reduce the total number of APCs to a minimum of 206. The exact mechanism for DALOs use of options will be described in detail in the acquisition contract.
As described under II.2.2) the number of APCs to be delivered can be adjusted by DALO's use of positive options which can increase the total number of APCs to be delivered under the contract to a maximum of 450. In addition, DALO will have the possibility to take advantage of negative options which conversely will reduce the total number of APCs to a minimum of 206. The exact mechanism for DALOs use of options will be described in detail in the acquisition contract.
Prior to delivery, the supplier shall install a variety of equipment that is furnished by DALO. This equipment includes remote controlled weapon stations, battle management systems, radio equipment, etc. The type of equipment will depend on the variant in question.
Prior to delivery, the supplier shall install a variety of equipment that is furnished by DALO. This equipment includes remote controlled weapon stations, battle management systems, radio equipment, etc. The type of equipment will depend on the variant in question.
The supplier shall have a full system responsibility. This means that the supplier maintains full responsibility for the fulfilment of the general fit for purpose obligation notwithstanding any changes, upgrades or modifications (including the changes following from installation of equipment furnished by DALO) made to the APCs by DALO or third parties of any kind. The exact terms and conditions for the supplier’s system responsibility will be described in detail in the acquisition contract.
The supplier shall have a full system responsibility. This means that the supplier maintains full responsibility for the fulfilment of the general fit for purpose obligation notwithstanding any changes, upgrades or modifications (including the changes following from installation of equipment furnished by DALO) made to the APCs by DALO or third parties of any kind. The exact terms and conditions for the supplier’s system responsibility will be described in detail in the acquisition contract.
In addition to the delivery of APCs, the contract includes (1) delivery of an initial stock of spare parts for each APC, (2) Special tools and test equipment, (3) Documentation and (4) Training services.
While executing the contract, the supplier shall observe relevant secrecy obligations.
In addition to this contract, a separate tender procedure is initiated for a sustainment contract (framework contract) covering a variety of services, including management and maintenance services, supply of further spare parts etc. The sustainment contract is also awarded through a negotiated procedure with publication of a notice. The 2 contracts are to be seen as a whole and will be awarded to the same tenderer. Thus, it is a precondition for a tender to be taken into consideration for the award of this contract, that a tender is also submitted for the sustainment contract. Hence, all tenderes have to be selected and to submit tenders in both tender procedures.
In addition to this contract, a separate tender procedure is initiated for a sustainment contract (framework contract) covering a variety of services, including management and maintenance services, supply of further spare parts etc. The sustainment contract is also awarded through a negotiated procedure with publication of a notice. The 2 contracts are to be seen as a whole and will be awarded to the same tenderer. Thus, it is a precondition for a tender to be taken into consideration for the award of this contract, that a tender is also submitted for the sustainment contract. Hence, all tenderes have to be selected and to submit tenders in both tender procedures.
Delkontraktnummer: 1
Delkontraktens titel: Acquisition of Armoured Personnel Carriers based on tracks (lot 1)
Kort beskrivelse: Acquisition of Armoured Personnel Carriers based on tracks, cf. above.
Mængde eller omfang: Cf. above.
Yderligere oplysninger om delkontrakterne: Cf. above.
Delkontraktnummer: 2
Delkontraktens titel: Acquisition of Armoured Personnel Carriers based on wheels (minimum 4 axles) (lot 2)
Kort beskrivelse: Acquisition of Armoured Personnel Carriers based on wheels, cf. above.
Beskrivelse af mulighederne:
Positive options allowing DALO to purchase up to a total maximum of 450 APCs. Furthermore, DALO can use negative options bringing the total number of APCs to be delivered down to 206.
In addition a further number of options will be described in the Tender Conditions.
Referencenummer: 2011/003664
Sted for udførelsen
Hovedsted eller sted for udførelsen: Denmark.
Juridiske, økonomiske, finansielle og tekniske oplysninger Betingelser for deltagelse
Egnethed til at udøve det erhverv:
A solemn declaration stating to which degree the candidate has fulfilled his obligations relating to the payment of direct and indirect taxes and social security contributions in accordance with the legal provisions of the country in which the candidate is established and in Denmark in accordance with Consolidation Act No. 336 of 13.5.1997 regarding public payments. An outline of the declaration will be distributed on the information meeting regarding pre-qualification in June 2012 or can be obtained by e-mailing a request for the outline to APC-R@mil.dk.
A solemn declaration stating to which degree the candidate has fulfilled his obligations relating to the payment of direct and indirect taxes and social security contributions in accordance with the legal provisions of the country in which the candidate is established and in Denmark in accordance with Consolidation Act No. 336 of 13.5.1997 regarding public payments. An outline of the declaration will be distributed on the information meeting regarding pre-qualification in June 2012 or can be obtained by e-mailing a request for the outline to APC-R@mil.dk.
As an alternative to a solemn declaration, a report from the Danish Commerce and Companies Agency (in Danish: "Service attest") may be submitted. The report must be issued within the last six months before the deadline of prequalification.
Foreign candidates submitting an equal report from their country shall also submit a solemn declaration regarding obligations in Denmark. The report must be issued within the last six months before the deadline of prequalification.
If the candidate is submitted by a joint group of supplier (e.g. a consortium) each member of the consortium must submit the declaration.
Økonomisk og finansiel stilling:
The three latest published annual audited financial statements.
If the application is submitted by a joint group of suppliers (e.g. a consortium) each member of the consortium must fulfil the requirement concerning solvency ratio. Reference is made to section VI.3 with regard to the candidate's possibility of relying on the capacity of other entities. For the requirement concerning annual turnover, this can be fulfilled by adding the turnover of the group members in total.
If the application is submitted by a joint group of suppliers (e.g. a consortium) each member of the consortium must fulfil the requirement concerning solvency ratio. Reference is made to section VI.3 with regard to the candidate's possibility of relying on the capacity of other entities. For the requirement concerning annual turnover, this can be fulfilled by adding the turnover of the group members in total.
Mindstekrav til niveauet:
Candidates shall be able to demonstrate by reference to the three latest published annual audited financial statements to have (1) a solvency ratio of at least 20 percent - calculated by dividing the economic operator's equity with the economic operator's total assets (equity/total assets x 100) - in each year and (2) an annual turnover of at least 500 000 000 DKK (in writing five hundred million Danish Kroner) (if applicable, based on the official exchange rate of the Danish National Bank as per 1.5.2012) in each year.
Candidates shall be able to demonstrate by reference to the three latest published annual audited financial statements to have (1) a solvency ratio of at least 20 percent - calculated by dividing the economic operator's equity with the economic operator's total assets (equity/total assets x 100) - in each year and (2) an annual turnover of at least 500 000 000 DKK (in writing five hundred million Danish Kroner) (if applicable, based on the official exchange rate of the Danish National Bank as per 1.5.2012) in each year.
Teknisk og faglig kompetence:
A list of the most important similar deliveries/works and services (comprising the sustainment services) carried out over the past 5 years regarding delivery of armoured vehicles based on either tracks or wheels.
The list of works shall indicate the value of the works/services in question (purchase prices), the date(s) of deliveries and the recipients involved (names not required, but information regarding whether or not the customer(s) involved were NATO-countries). The value must be divided between deliveries and works/services and enclosed a brief description of the sustainment part.
The list of works shall indicate the value of the works/services in question (purchase prices), the date(s) of deliveries and the recipients involved (names not required, but information regarding whether or not the customer(s) involved were NATO-countries). The value must be divided between deliveries and works/services and enclosed a brief description of the sustainment part.
Photographs of the APC that the candidate will offer if prequalified. The photographs shall show the outside as well as the inside of the APC. The photographs of the outside shall show the front, back, top, and both sides of the APC while the photographs of the inside shall show the crew cabin and shall be taken from the back of cabin towards the driver seat.
Photographs of the APC that the candidate will offer if prequalified. The photographs shall show the outside as well as the inside of the APC. The photographs of the outside shall show the front, back, top, and both sides of the APC while the photographs of the inside shall show the crew cabin and shall be taken from the back of cabin towards the driver seat.
Candidates shall demonstrate that they can ensure a stable supply by submitting a description of the technical features and measures used by the candidate to ensure quality (maximum 1 page with 2 300 keystrokes).
If the application is submitted by a joint group of suppliers (e.g. a consortium) each member of the consortium must fulfil these requirements relating to documentation. The minimum requirement must be fulfilled by the joint group of suppliers as a whole. Reference is made to section VI.3 with regard to the candidate's possibility of relying on the capacity of other entities.
If the application is submitted by a joint group of suppliers (e.g. a consortium) each member of the consortium must fulfil these requirements relating to documentation. The minimum requirement must be fulfilled by the joint group of suppliers as a whole. Reference is made to section VI.3 with regard to the candidate's possibility of relying on the capacity of other entities.
Mindstekrav til niveauet:
The candidates shall demonstrate that they during the past five years have had experience with (1) delivery of armoured vehicles based on either tracks or wheels and (2) provision of spares and services as part of a sustainment arrangement concerning the above mentioned vehicles.
The candidates shall demonstrate that they during the past five years have had experience with (1) delivery of armoured vehicles based on either tracks or wheels and (2) provision of spares and services as part of a sustainment arrangement concerning the above mentioned vehicles.
Kontraktens udførelse
Krav om deponering og sikkerhedsstillelse:
If prepayments are made, an on-demand guarantee from a recognized financial institution must be presented. The financial institution has to be approved by DALO.
De vigtigste finansieringsbetingelser og betalingsordninger og/eller henvisning til de relevante bestemmelser, der regulerer dem:
Reference is made to the tender documents with regard to the payment terms. Invoicing must be done in accordance with the at any time applicable Danish legislation on public payments. At present this is the Danish consolidation act. no. 798 of June 2007 which demands that invoicing must be done electronically. Exact terms will be stated in the Acquisition Contract.
De vigtigste finansieringsbetingelser og betalingsordninger og/eller henvisning til de relevante bestemmelser, der regulerer dem
Reference is made to the tender documents with regard to the payment terms. Invoicing must be done in accordance with the at any time applicable Danish legislation on public payments. At present this is the Danish consolidation act. no. 798 of June 2007 which demands that invoicing must be done electronically. Exact terms will be stated in the Acquisition Contract.
Den juridiske form, som den sammenslutning af økonomiske aktører, der skal have kontrakten, skal have:
No special legal form is required. If the order is awarded to a group of suppliers (e.g. a consortium) the participants are required to undertake joint and several liabilities and to appoint one supplier to represent the group.
Procedure
Mindste antal ansøgere: 6
Største antal ansøgere: 8
Objektive kriterier for udvælgelse:
The selection of the candidates (3-4 per lot) that will be invited to submit tenders to each lot will be based on:
a) The amount involved, the frequency and nature of the candidates' previous deliveries of armoured vehicles based on either tracks (lot 1) or wheels (lot 2). In that regard, deliveries of armoured personnel carriers will be of preference.
b) The candidates' experience with provision of spare parts and services as part of a sustainment arrangement concerning the relevant vehicles.
c) The economical and financial standing of the candidates.
DALO reserves the right to reject an application for pre-qualification if the candidate or any sub-supplier is deemed unsuitable for participation in the competition and/or as supplier to the Danish Defence, cf. Clause 39(2) in Directive 2009/81/EC.
Datoer
Dato for afsendelse af opfordringer til at afgive tilbud eller deltage til de udvalgte ansøgere: 2012-07-10 📅
Sprog
Sprog: engelsk 🗣️
Reference Datoer
Startdato: 2014-04-30 📅
Slutdato: 2023-12-31 📅
Offentliggørelsesdato: 2011-05-20 📅
2012-02-21 📅
2011-09-16 📅
Identifikatorer
Type af tidligere offentliggørelse: Prior_information_notice
Meddelelsesnummer i EUT S: 2012/S 035-056216
2011/S 178-292136
Yderligere oplysninger
Information meeting regarding pre-qualification.
DALO invites all candidates to attend a presentation meeting at DALO's premises in week 24, 2012. If interested in participating in the meeting, the candidates shall submit a request pr. e-mail to APC-R@mil.dk no later than 4.6.2012. Each candidate will be assigned a specific meeting time for the presentation and this will be submitted to the candidate pr. e-mail. Thus, the candidate should make sure when requesting to participate in the meeting to provide DALO with an e-mail address that this information can be sent to.
DALO invites all candidates to attend a presentation meeting at DALO's premises in week 24, 2012. If interested in participating in the meeting, the candidates shall submit a request pr. e-mail to APC-R@mil.dk no later than 4.6.2012. Each candidate will be assigned a specific meeting time for the presentation and this will be submitted to the candidate pr. e-mail. Thus, the candidate should make sure when requesting to participate in the meeting to provide DALO with an e-mail address that this information can be sent to.
The meeting will last for approximately 1 hour and in the meeting, DALO will go through the pre-qualification criteria and answer any questions asked by the candidates. Anonymised questions/answers concerning the pre-qualification criteria and documents to be submitted that DALO thinks is of importance to all candidates will be e-mailed to all the candidates.
The meeting will last for approximately 1 hour and in the meeting, DALO will go through the pre-qualification criteria and answer any questions asked by the candidates. Anonymised questions/answers concerning the pre-qualification criteria and documents to be submitted that DALO thinks is of importance to all candidates will be e-mailed to all the candidates.
Testing of test-vehicle.
As part of the tender procedure and prior to awarding the contract, tests will be conducted on a test-vehicle to verify that the equipment included in the tenderers’ offer complies with the demands of DALO provided that the indicative offer fulfills the mandatory requirements. Furthermore, the evaluation of the offers will be based partly on the tests. In order for a submitted APC to be characterised as a "test-vehicle", the APC must - as a minimum - be based on the same hull structure, have the same driveline and the same undercarriage as the APC offered to DALO.
As part of the tender procedure and prior to awarding the contract, tests will be conducted on a test-vehicle to verify that the equipment included in the tenderers’ offer complies with the demands of DALO provided that the indicative offer fulfills the mandatory requirements. Furthermore, the evaluation of the offers will be based partly on the tests. In order for a submitted APC to be characterised as a "test-vehicle", the APC must - as a minimum - be based on the same hull structure, have the same driveline and the same undercarriage as the APC offered to DALO.
The tests are scheduled to take place primarily at Oksbøl in Denmark from either January 2013 or March 2013 depending on the number of candidates for test and will require each tenderer to supply one APC (infantry configuration) to DALO no later than week 3 / week 12, 2013. The tests are expected to have a duration of approx. 3-4 months. All tenderers should therefore make the necessary preparations and be aware of any export restrictions being applied in their home countries and take the necessary steps to obtain the requisite permits in time in order for the test vehicle to be in Oksbøl in week 3 / week 12, 2013. The exact time for the tests will be stated in the tender documents 10 July 2012.
The tests are scheduled to take place primarily at Oksbøl in Denmark from either January 2013 or March 2013 depending on the number of candidates for test and will require each tenderer to supply one APC (infantry configuration) to DALO no later than week 3 / week 12, 2013. The tests are expected to have a duration of approx. 3-4 months. All tenderers should therefore make the necessary preparations and be aware of any export restrictions being applied in their home countries and take the necessary steps to obtain the requisite permits in time in order for the test vehicle to be in Oksbøl in week 3 / week 12, 2013. The exact time for the tests will be stated in the tender documents 10 July 2012.
Negotiations.
Negotiations will be focused on the strengths and weaknesses of the submitted tenders and will be based on the contract award criteria as well as possible reservations to the terms of the tender.
DALO reserves the right to - based on the award criteria - shortlist the candidates after the evaluation of the indicative offers (i.e. to reduce the number of candidates per lot with 1 - 2 tenderer(s) even if the tenderer(s) in question fulfils the minimum requirements). No more than 6 tenderes will be asked to participate in the tests. It does not have to be three from each lot (ie. three wheelbased and three tracked). It can for instance also be two tracked APCs and up to four wheelbased APCs.
DALO reserves the right to - based on the award criteria - shortlist the candidates after the evaluation of the indicative offers (i.e. to reduce the number of candidates per lot with 1 - 2 tenderer(s) even if the tenderer(s) in question fulfils the minimum requirements). No more than 6 tenderes will be asked to participate in the tests. It does not have to be three from each lot (ie. three wheelbased and three tracked). It can for instance also be two tracked APCs and up to four wheelbased APCs.
After having conducted the negotiations, a revised set of tender documents may be submitted based on the experiences from the negotiations. Hereafter, the candidates are requested to make any alteration (if any) to the indicative offer necessitated by the negotiations and to submit either af new indicative offer that leads to further negotiations or a best and final offer (BAFO).
After having conducted the negotiations, a revised set of tender documents may be submitted based on the experiences from the negotiations. Hereafter, the candidates are requested to make any alteration (if any) to the indicative offer necessitated by the negotiations and to submit either af new indicative offer that leads to further negotiations or a best and final offer (BAFO).
After receipt of the BAFO, DALO will evaluate all the best and final offers in order to identify the most economically advantageous offer, using the award criteria as further described in the tender conditions.
Re. section III.2).
A candidate may rely on the economic, financial and/or technical capacity of other entities, regardless of the legal nature of the links with the entities. If a candidate relies on other entities the candidate must prove to the contracting authority the disposal of the resources necessary for performance of the contract, for example by producing an undertaking on the part of those entities to that effect.
A candidate may rely on the economic, financial and/or technical capacity of other entities, regardless of the legal nature of the links with the entities. If a candidate relies on other entities the candidate must prove to the contracting authority the disposal of the resources necessary for performance of the contract, for example by producing an undertaking on the part of those entities to that effect.
A candidate may, for example, rely on other entities' economic capacity, cf. clause 41(2) in Directive 2009/81/EC. If so, the candidate must provide documentation that the other entities will and shall put the relevant economic resources at the disposal of the candidate. Furthermore the candidate must provide the same type of information regarding the other entities' economic capacity as the candidate shall submit of his own economic capacity.
A candidate may, for example, rely on other entities' economic capacity, cf. clause 41(2) in Directive 2009/81/EC. If so, the candidate must provide documentation that the other entities will and shall put the relevant economic resources at the disposal of the candidate. Furthermore the candidate must provide the same type of information regarding the other entities' economic capacity as the candidate shall submit of his own economic capacity.
Re. section IV.1.2).
Should any of the prequalified candidates choose not to submit the first indicative offer and thereby leaving DALO with a very limited number of offers to evaluate, DALO reserves the right to postpone the evaluation procedure and reopen the prequalification round in order to invite one or more of the rejected candidates (depending on how many candidates that chose not to submit an indicative offer) to join the tender procedure.
Should any of the prequalified candidates choose not to submit the first indicative offer and thereby leaving DALO with a very limited number of offers to evaluate, DALO reserves the right to postpone the evaluation procedure and reopen the prequalification round in order to invite one or more of the rejected candidates (depending on how many candidates that chose not to submit an indicative offer) to join the tender procedure.
Re. section IV 3.4).
Each candidate may only submit one application per lot. The application should preferably be submitted in 3 paper copies and 1 electronic copy on a CD-ROM or an equivalent medium.
The application should preferably be marked "Armoured Personnel Carriers – Confidential, att.: Lt. Col. Karsten Kolding – må ikke åbnes ved intern postfordeling". The application must be delivered in a sealed envelope to the address stated in section I.1 and may not be forwarded by e-mail.
The application should preferably be marked "Armoured Personnel Carriers – Confidential, att.: Lt. Col. Karsten Kolding – må ikke åbnes ved intern postfordeling". The application must be delivered in a sealed envelope to the address stated in section I.1 and may not be forwarded by e-mail.
Furthermore the candidate is requested to submit an e-mail address of a contact person to which relevant information may be forwarded.
Supplerende oplysninger Gennemgå organ
Navn: Klagenævnet for Udbud (The Complaints Board for Public Procurement), Erhvervs- og Selskabsstyrelsen
Postadresse: Kampmannsgade 1
Postby: København V
Postnummer: 1780
Land: Danmark 🇩🇰
E-mail: klfu@eogs.dk📧
Telefon: +45 33307700📞
Internetadresse: http://www.klfu.dk🌏
Fax: +45 33307799 📠
Oplysninger om frister for klageprocedurer:
As a consequence of the Danish act no. 492 of 12.5.2010 regarding enforcement of the rules for procurement etc. complaints regarding a candidate not being prequalified must be filed with The Complaints Board for public procurement within 30 calendar days starting the day after the contracting authority has sent notification to the candidates involved, if the notification includes a short account of the relevant reasons for the decision.
As a consequence of the Danish act no. 492 of 12.5.2010 regarding enforcement of the rules for procurement etc. complaints regarding a candidate not being prequalified must be filed with The Complaints Board for public procurement within 30 calendar days starting the day after the contracting authority has sent notification to the candidates involved, if the notification includes a short account of the relevant reasons for the decision.
Complaints concerning other decisions related to the tender must be filed with The Complaints Board for public procurement within 6 months after the Contracting Authority has published a notification in the Official Journal of the European Union that the Contracting Authority has entered into a contract. The 6 month period begins the day after publication of the notification.
Complaints concerning other decisions related to the tender must be filed with The Complaints Board for public procurement within 6 months after the Contracting Authority has published a notification in the Official Journal of the European Union that the Contracting Authority has entered into a contract. The 6 month period begins the day after publication of the notification.
The complainant must inform the contracting authority of the appeal in writing at the latest simultaneously with the lodge of the complaint to The Complaints Board for Public Procurement. The complainant shall state whether the complaint has been lodged in the stand-still period. If the appeal has not been lodged in the stand-still period, the appellant must also state whether it is requested that the appeal is granted delaying effect.
The complainant must inform the contracting authority of the appeal in writing at the latest simultaneously with the lodge of the complaint to The Complaints Board for Public Procurement. The complainant shall state whether the complaint has been lodged in the stand-still period. If the appeal has not been lodged in the stand-still period, the appellant must also state whether it is requested that the appeal is granted delaying effect.
Tjeneste, hvorfra der kan indhentes oplysninger om klageproceduren
Navn: Konkurrence- og Forbrugerstyrelsen, Center for Tjenesteydelser, Udbud og Karteller (Danish Competition and Consumer Authority)
Postadresse: Carl Jacobsens Vej 35
Postby: Valby
Postnummer: 2500
Telefon: +45 41715000📞
Internetadresse: http://www.kfst.dk🌏
Fax: +45 41715100 📠
Kilde: OJS 2012/S 101-168364 (2012-05-25)
Bekendtgørelse om indgåede kontrakter (2015-12-15) Objekt Omfanget af udbuddet
Den samlede værdi af udbuddet: 5 200 000 000 💰
Bekendtgørelsens metadata
Dokumenttype: Bekendtgørelse om indgåede kontrakter
The stated total final value of the contract for 309 vehicles, cf. II.2.1) and V.4), covers the price of the acquisition contract as well as the sustainment contract for which a separate contract award notice is published.
Procedure Kriterier for tildeling
Kriterium: 1. Price (40)
2. Performance (30)
3. Future development potential and quality assurance (30)
Tildeling af kontrakt
Navn: General Dynamics European Land Systems — Mowag GmbH
Postadresse: Unterseestrasse 65
Postby: Kreuzlingen
Postnummer: 8280
Land: Schweiz 🇨🇭
Internetadresse: http://www.gdels.com🌏
Ordregivende myndighed Kontakt
Enhed: Lt. Col. Gert Bode
Reference Identifikatorer
Meddelelsesnummer i EUT S: 2012/S 35-056216
Supplerende oplysninger Gennemgå organ
Navn: Klagenævnet for udbud (The Complaints Board for Public Procurement)
Postadresse: Dahlerups Pakhus, Langelinie Allé 17
Postby: Copenhagen Ø
Postnummer: 2100
E-mail: klfu@erst.dk📧
Telefon: +45 33307621📞
Internetadresse: www.klfu.dk🌏
Oplysninger om frister for klageprocedurer:
As a consequence of the Danish Act No 492 of 12.5.2010 with subsequent amendments regarding enforcement of the rules for procurement etc. complaints regarding a tender must be filed with The Complaints Board for Public Procurement within 45 calendar days after the contracting authority has published a contract award notice in the Official Journal of the European Union (with effect from the day following the publication date). However, complaints regarding a framework agreement must be file with The Complaints Board for Public Procurement within 6 months starting the day after the contracting authority has sent notification to the candidates involved, if the notification includes a short account of the relevant reasons for the decision.
As a consequence of the Danish Act No 492 of 12.5.2010 with subsequent amendments regarding enforcement of the rules for procurement etc. complaints regarding a tender must be filed with The Complaints Board for Public Procurement within 45 calendar days after the contracting authority has published a contract award notice in the Official Journal of the European Union (with effect from the day following the publication date). However, complaints regarding a framework agreement must be file with The Complaints Board for Public Procurement within 6 months starting the day after the contracting authority has sent notification to the candidates involved, if the notification includes a short account of the relevant reasons for the decision.
The complainant must inform the contracting authority of the appeal in writing at the latest simultaneously with the lodge of the complaint to The Complaints Board for Public Procurement. The complainant shall state whether the complaint has been lodged in the standstill period. If the appeal has not been lodged in the standstill period, the appellant must also state whether it is requested that the appeal is granted delaying effect.
The complainant must inform the contracting authority of the appeal in writing at the latest simultaneously with the lodge of the complaint to The Complaints Board for Public Procurement. The complainant shall state whether the complaint has been lodged in the standstill period. If the appeal has not been lodged in the standstill period, the appellant must also state whether it is requested that the appeal is granted delaying effect.
Tjeneste, hvorfra der kan indhentes oplysninger om klageproceduren
Navn: Konkurrence-og Forbrugerstyrelsen (The Danish Competition and Consumer Authority)
Telefon: +45 72268000📞
Internetadresse: www.kfst.dk🌏
Kilde: OJS 2015/S 244-443533 (2015-12-15)
Bekendtgørelse med henblik på frivillig forudgående gennemsigtighed (2016-06-02) Objekt Omfanget af udbuddet
Kort beskrivelse:
DALO has entered into a contract regarding the acquisition and sustainment of 309 Armoured Personnel Carriers (APCs) for replacement of the existing fleet for the entire Danish Army. The contract has been awarded to General Dynamics European Land Systems — Mowag GmbH, cf. contract award notice 2015/S 244-443533 concerning the acquisition contract and contract award notice 2015/S 244-443532 concerning the sustainment contract.
DALO has entered into a contract regarding the acquisition and sustainment of 309 Armoured Personnel Carriers (APCs) for replacement of the existing fleet for the entire Danish Army. The contract has been awarded to General Dynamics European Land Systems — Mowag GmbH, cf. contract award notice 2015/S 244-443533 concerning the acquisition contract and contract award notice 2015/S 244-443532 concerning the sustainment contract.
Den samlede værdi af udbuddet: 5 200 000 000 DKK 💰
Bekendtgørelsens metadata
Dokumenttype: Bekendtgørelse med henblik på frivillig forudgående gennemsigtighed
Fælles glossar for offentlige kontrakter (CPV)
Yderligere CPV-kode: Mekaniske reservedele til militærkøretøjer📦 Sted for udførelsen
NUTS-region: Danmark
🏙️
Procedure
Procedureform: V: Tildeling af kontrakt uden forudgående offentliggørelse
Kriterier for tildeling
Andet
The stated total final value of the contract for 309 APCs, cf. II.1.7) and V.2.4) covers the price of the acquisition contract as well as the sustainment contract.
Objekt Omfanget af udbuddet
Kort beskrivelse:
The award of the contract has been subject to prior publication of a Contract Notice in the OJEU/TED, and a full procurement process has been conducted. This voluntary ex ante transparency notice is published since it has been decided to replace the engine of the Armoured Personnel Carriers (APCs) with a different engine compared to the engine offered in the winning tender. The change of the engine will not lead to increased costs for DALO and it is expected that the replacement will entail a slightly lower cost. The offered APC has undergone renewed testing with the new engine to validate fulfilment of all requirements of the tender, which was achieved. The change will have no consequence for the time schedule for delivery of the APCs. It is DALO's assessment that the change of the engine does not constitute a material change of the contract and hence, that the change can be performed within the limits of the conducted tender process.
The award of the contract has been subject to prior publication of a Contract Notice in the OJEU/TED, and a full procurement process has been conducted. This voluntary ex ante transparency notice is published since it has been decided to replace the engine of the Armoured Personnel Carriers (APCs) with a different engine compared to the engine offered in the winning tender. The change of the engine will not lead to increased costs for DALO and it is expected that the replacement will entail a slightly lower cost. The offered APC has undergone renewed testing with the new engine to validate fulfilment of all requirements of the tender, which was achieved. The change will have no consequence for the time schedule for delivery of the APCs. It is DALO's assessment that the change of the engine does not constitute a material change of the contract and hence, that the change can be performed within the limits of the conducted tender process.
Beskrivelse af mulighederne:
The total number of APCs can be adjusted within the limits stated in the contract notice (between 206 and 450). Further, the tender encompassed a number of technical options which were further described in the tender material.
Tildeling af kontrakt
Dato for kontraktindgåelse: 2015-04-30 📅
Ordregivende myndighed Kontakt
Enhed: Lt Col Gert Bode
Internetadresse: www.forsvaret.dk/fmt/eng🌏
Supplerende oplysninger Gennemgå organ
Navn: Klagenævnet for Udbud (The Complaints Board for Public Procurement)
Oplysninger om frister for klageprocedurer:
If the Contracting Authority have followed the procedure provided by section 4 of the Danish Act No 492 of 12.5.2010 with subsequent amendments regarding enforcement of the rules for procurement, etc. complaints regarding that a Contracting authority in non-compliance with the public procurement directive has awarded a contract without publication of a contract notice in Official Journal of the European Union must be filed with The Complaints Board for Public Procurement within 30 calendar days starting the day after the day on which the contracting authority has published a voluntary ex ante transparency notice in OJEU/TED, cf. section 7(3) of the Danish Act No 492 of 12.5.2010.
If the Contracting Authority have followed the procedure provided by section 4 of the Danish Act No 492 of 12.5.2010 with subsequent amendments regarding enforcement of the rules for procurement, etc. complaints regarding that a Contracting authority in non-compliance with the public procurement directive has awarded a contract without publication of a contract notice in Official Journal of the European Union must be filed with The Complaints Board for Public Procurement within 30 calendar days starting the day after the day on which the contracting authority has published a voluntary ex ante transparency notice in OJEU/TED, cf. section 7(3) of the Danish Act No 492 of 12.5.2010.
Other complaints must be filed with The Complaints Board for Public Procurement within 45 calendar days after the contracting authority has published a contract award notice in the Official Journal of the European Union (with effect from the day following the publication date).
Other complaints must be filed with The Complaints Board for Public Procurement within 45 calendar days after the contracting authority has published a contract award notice in the Official Journal of the European Union (with effect from the day following the publication date).
Tjeneste, hvorfra der kan indhentes oplysninger om klageproceduren
Land: Danmark 🇩🇰
E-mail: kfst@kfst.dk📧
Kilde: OJS 2016/S 107-191363 (2016-06-02)