Wood dust doing plant

Vattenfall A/S

The supply includes design, manufacturing, supply, installation, testing and commissioning of an indirect co-firing system for wood dust for an existing biomass co-firing plant located at Nordjyllandsværket in the city of Aalborg. The supply includes a wood dust storage silo, compressor, and dosing equipment for wood dust to be co-fired into existing coal dust fired boiler. The supply ends when the dosing equipment is attached to the existing coal dust fired boiler.
The scope of supply includes an option to extend the capacity.
Simultaneous with this contract notice, contract notice of wood chip transport and storage equipment, contract notice of wood chip grinding and drying equipment and contract notice for burner modification is affected for the biomass co-firing plant for located at Nordjyllandsværket in the city of Aalborg.
The supplier shall be able to provide maintenance and support to the equipment.

Deadline
Fristen for modtagelse af bud var på 2011-10-24. Indkøbet blev offentliggjort på 2011-09-28.

Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2011-09-28 Udbudsbekendtgørelse