Total or partial replacement and commissioning of high temperature pressure parts of the two parts boiler of Studstrup 400 MW Power Station
This prequalification notice concerns supply of Superheater, reheater, primary and secondary boxes. The supply includes dismantling of existing heaters, engineering, pre-manufacturing, erection and commissioning. All materials are included in the supply.
Deadline
Fristen for modtagelse af bud var på 2011-10-17.
Indkøbet blev offentliggjort på 2011-09-23.
Hvem?
Hvad?
Hvor?
Indkøbshistorik
Dato |
Dokument |
2011-09-23
|
Udbudsbekendtgørelse
|