Total or partial replacement and commissioning of high temperature pressure parts of the two parts boiler of Studstrup 400 MW Power Station

DONG Energy Power A/S

This prequalification notice concerns supply of Superheater, reheater, primary and secondary boxes. The supply includes dismantling of existing heaters, engineering, pre-manufacturing, erection and commissioning. All materials are included in the supply.

Deadline
Fristen for modtagelse af bud var på 2011-10-17. Indkøbet blev offentliggjort på 2011-09-23.