Prequalification regarding construction projects for 500 kV DC land cable to Skagerrak 4 HVDC connection

Energinet.dk

— Excavation and back covering of cable tranch for 110 km 500 kV HVDC cable,
— Take up old cable and laying of 9 km new electrode cable from pylon 212 to Lovns,
— Laying of 110 km, 1 x 1600 mm2 Cu HVDC cable,
— Laying of 18 km, 3 x 1 x 500 mm2 Al electrode cable from Tjele to pylon 212,
— Laying of 9 km, 3 x 1 x 400 mm2 Al electrode cable from pylon 212 to Lovns,
— All Horizontal Directional Drillings along the cable route with the exception of the Limfjord crossing,
— Re-establishment of all drains along the cable route.

Deadline
Fristen for modtagelse af bud var på 2011-09-09. Indkøbet blev offentliggjort på 2011-08-19.

Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2011-08-19 Udbudsbekendtgørelse