Prequalification for 914/11 FSPA visual enhancement project aggersund - directional drilling for high voltage DC and AC cables

Energinet.dk

Design and perform 5 directional drillings including installation and preparation of PE ducts and casingsunder the Limfjord, for later high voltage DC and AC cable pulling. The work site is approx. 300 m east of theAggersund Bridge in the northern part of Jutland. The anticipated length of the drillings is 1 500 m each.

Deadline
Fristen for modtagelse af bud var på 2011-06-23. Indkøbet blev offentliggjort på 2011-06-08.

Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2011-06-08 Udbudsbekendtgørelse