Modernization of "Ljungström" Air Preheater sealing system for Studstrup 400 MW power station

DONG Energy Power A/S

Renovation and modernization of mechanical sealing system at existing Air Preheater.
The flue gas air preheater at Studstrup is made as a regenerative Ljungstrom sector-divided type.
The new sealing system shall cope with the thermal expansion of the rotor system.
The supply includes actuators.

Deadline
Fristen for modtagelse af bud var på 2011-12-09. Indkøbet blev offentliggjort på 2011-11-10.

Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2011-11-10 Udbudsbekendtgørelse