Modernization of "Ljungström" Air Preheater sealing system for Studstrup 400 MW power station
Renovation and modernization of mechanical sealing system at existing Air Preheater.
The flue gas air preheater at Studstrup is made as a regenerative Ljungstrom sector-divided type.
The new sealing system shall cope with the thermal expansion of the rotor system.
The supply includes actuators.
Deadline
Fristen for modtagelse af bud var på 2011-12-09.
Indkøbet blev offentliggjort på 2011-11-10.
Hvem?
Hvad?
Hvor?
Indkøbshistorik
Dato |
Dokument |
2011-11-10
|
Udbudsbekendtgørelse
|