Directional Drilling and MWD

Viborg Fjernvarme m.fl.

Prequalification for provisions of directional drilling and MWD for 4 geothermal exploration wells and 22 optional wells at 4 different locations in Jutland, Denmark. If the result of the flow test in the 4 exploration wells is positive, up to 22 optional wells are expected. The scope of work for service is to supply the operator with directional drilling and MWD that will be required to drill, test and complete wells to a depth between 2500 to 3500 m. (vertical, deviated or horizontal). The programme is to drill a 17 ½” hole, set a 13 ⅜” casing at +/- 250 m. Drill a 12 ¼” hole and set a 9 ⅝” casing at +/- 2000 m. Drill a 8 ½” hole and set a 7” liner at +/- 2400 m. Then drill a 6” hole and run 5” lower completion to +/- 2600 m.
The delivery is expected to start in the beginning of September 2011 and is expected to have a duration of 24 months if all the optional wells will be drilled.
The tender is on behalf of 4 contracting authorities: Viborg Fjernvarme, Tønder Fjernvarme, Aabenraa-Rødekro Fjernvarme og Skive Kommunes future geothermal company (Skive Geotermi A/S).

Deadline
Fristen for modtagelse af bud var på 2011-07-19. Indkøbet blev offentliggjort på 2011-06-29.

Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2011-06-29 Udbudsbekendtgørelse