Design, manufacturing, delivery and commissioning of equipment for 6 kV medium voltage switchgear at Studstrup 400 MW power station
This prequalification notice concerns 6 kV medium voltage switchgear equipment for boiler/turbine and coal yard as follows:
6 kV medium voltage switchgear equipment for boiler/turbine:
— Design, manufacturing, delivery and commissioning of 6 kV medium voltage switchgear alternatively retrofit of circuit breakers in existing cubicles,
— Design, manufacturing, delivery and commissioning of fast switch over equipment for 6 kV medium voltage switchgear.
6 kV medium voltage switchgear equipment for coal yard:
— Design, manufacturing, delivery and commissioning of 6 kV medium voltage switchgear replacing existing switchgear.
Deadline
Fristen for modtagelse af bud var på 2011-10-28.
Indkøbet blev offentliggjort på 2011-10-06.
Hvem?
Hvad?
Hvor?
Indkøbshistorik
Dato |
Dokument |
2011-10-06
|
Udbudsbekendtgørelse
|