Baggage Handling System (BHS) enhancement project
The contractor is to furnish and install a turnkey solution including mechanical equipment and installation, electrical equipment and installation, controls equipment and installation and associated programming. Contract is to provide a phased solution which maintains airport operation and capacity throughout the construction.
Project consists of existing baggage handling system expansion to meet Copenhagen Airport’s growing capacity and throughput requirements. Expansion includes an increase in capacity throughout multiple aspects of the baggage handling process including check-in, main transport, baggage security screening, and early baggage storage.
Contract includes baggage security screening utilizing matrix / cluster philosophy including proper load balancing and fallback solutions.
Deadline
Fristen for modtagelse af bud var på 2012-01-23.
Indkøbet blev offentliggjort på 2011-12-16.