Nylige indkøb, hvor leverandøren Monsud SpA er nævnt
2016-11-11Tower procurement to Bulbjerg — Tjele (Energinet.dk)
The project is procuring 12 steel lattice towers for the Danish high voltage transmission grid to be used in a refurbishment of an old line. Along with the procurement of the towers additional stools are required in order to be able to refurbish all towers. The towers and stools are to be delivered at sites throughout northern Jutland, in the area between our station Tjele and the cable station in Bulbjerg. Everything must be delivered with a hot-dip galvanizing of a 200 µm thickness.
Se udbuddet » Nævnte leverandører:Monsud SpA