2016-10-14Kriegers Flak Combined Grid Solution UXO survey and services (Energinet.dk)
Kriegers Flak CGS (Combined Grid Solution) is a joint project between Energinet.dk and 50Hz Transmission to interconnect the Danish and German grid via the two offshore wind farms at Kriegers Flak and Baltic 2. The Contracting Authority wants to purchase UXO survey and services in order to reduce the risk level at the installation area along the 2 cable routes to As Low As Reasonably Practicable (ALARP). The services are: 1. Geophysical Survey 2. Inspection of possible UXO objects 3. Removal/Detonation …
Se udbuddet » Nævnte leverandører:Baltic Taucherei- und Bergungsbetrieb Rostock GmbH