De seneste indkøb af færdiggørelse af boring i Danmark
2021-12-15Snubbing unit for recompletion of To-7 at Lille Torup (Gas Storage Denmark)
Gas Storage Denmark A/S (GSD) owns and operates Denmark’s two underground gas storage facilities, which are located in Stenlille in the central part of Zealand (aquifer storage facility) and in Lille Torup in northern Jutland (salt cavern facility). GSD plans to execute the recompletion and gas fill of cavern Lille Torup 7 (To-7), which is currently brine filled. After the cavern To-7 is recompleted and the gas fill operation has taken place the installed debrining string has to be snubbed out of the …
Se udbuddet »
2021-11-04Workover rig for recompletion of To-7 at Lille Torup (Gas Storage Denmark A/S)
Gas Storage Denmark A/S (GSD) owns and operates Denmark’s two underground gas storage facilities, which are located in Stenlille in the central part of Zealand (aquifer storage facility) and in Lille Torup in northern Jutland (salt cavern facility). GSD plans to execute a recompletion workover at cavern Lille Torup 7 (To-7). For the recompletion a workover rig including the related technical equipment and personnel to perform the rig-assisted operation on the cavern To-7 is required.
Se udbuddet » Nævnte leverandører:MB Well Services GmbH
2015-08-11Framework Agreement for Work over Rig (Energinet.dk)
Framework Agreement for supply of a work over rig for rig-assisted recompletion well intervention on flooded natural gas storage cavern. Work over rig including equipment for recompletion operation (pulling and running casings and drill pipe, welded installation of production pipe). Regular hook load minimum is 150 t. If regular hook load is lower rig with certified hydraulic jacking unit feasible. The expected annual purchase under the framework agreement is 3 000 000 DKK.
Se udbuddet » Nævnte leverandører:Erdöl-Erdgas Workover GmbH
2015-08-11Framework Agreement for Welding Services (Energinet.dk)
Framework Agreement for Supply of Welding Services on production pipe during rig-assisted work over on natural gas storage including installation and services for X-ray and ultrasonic testing, distance measurements and radioactive markers.
The expected annual purchase under the framework agreement is 1 000 000 DKK.
Se udbuddet » Nævnte leverandører:PPS Pipeline Systems GmbH