2015-04-22Transport and installation of an Offshore Substation for Borkum Riffgrund 02, offshore wind farm (DONG Energy Wind Power A/S)
The work comprised by the Contract (the "Work") will consist of the following 2 lots:
Lot 1: The transport and installation of the jacket and piles for the offshore substation at the Borkum Riffgrund 02 offshore wind farm.
Lot 2: The transport and installation of the topside for the offshore substation at the Borkum Riffgrund 02 offshore wind farm.
A tender regarding Lot 1 and Lot 2, respectively, can be submitted as a stand-alone tender. Moreover, a tender regarding Lot 1 and Lot 2, respectively, can be …
Se udbuddet » Nævnte leverandører:Heerema Marine Contractors Nederland SE,...