De seneste indkøb af dele til gaskompressorer i Danmark
2023-03-07Framework Agreement for gas compressor packages (Energinet)
The Framework Agreement covers installation of a number of reverse-flow plants with compressors for moving upgraded biogas from the distribution grid into the 80 barg natural gas transmission grid in Denmark.
The compressor packages will have different requirements to capacity range as well as pressure range. Basically, the units shall cover the capacity range from 5.000 Nm3/hr., to 15.000 Nm3/hr., with a min. inlet pressure of either 12, 23 or 35 barg and an approximate max. outlet pressure of either 60 …
Se udbuddet »
2023-01-27Framework Agreement for gas compressor packages (Energinet)
The Framework Agreement covers installation of a number of reverse-flow plants with com-pressors for moving upgraded biogas from the distribution grid into the 80 barg natural gas transmission grid in Denmark.
The compressor packages will have different requirements to capacity range as well as pres-sure range. Basically, the units shall cover the capacity range from 5.000 Nm3/hr to 15.000 Nm3/hr, with a min. inlet pressure of either 12, 23 or 35 barg and an approximate max. outlet pressure of either 60 …
Se udbuddet »
2019-10-16Fiscal Gas Metering and Analysis System (Energinet Gas TSO A/S)
Tender for a fiscal gas metering and analysis system as a complete system that will be fully compliant with NORSOK standard l-106 2014. A complete fiscal gas metering and analysis system is scope of the tendered assignment. The system must be fully equipped with analyzer instruments for determination and reporting of gas quality parameters.
Se udbuddet » Nævnte leverandører:Emerson Automation Solutions