2011-10-14   Refurbisment of 150kV high voltage overhead lines at Studstrup 400 MW Power Station (DONG Energy Power A/S)
Lot 1 comprises: — Refurbisment of 150kV high voltage overhead lines. Lot 2 comprises: — Design, manufacturing, delivery and commissioning of 150kV high voltage circuit breakers. — Design, manufacturing, delivery and commissioning of protection relays for 150kV high voltage overhead lines. Se udbuddet »