2013-04-19   Major overhaul of generator at Kyndby Power Plant unit 22 (DONG Energy Thermal Power A/S)
Major overhaul of a 307 MVA static excitation generator, including stator core and rotor repair. The scope includes all mechanical engineering, services and tests. The planned outage for finalizing the the scope is 5 weeks. The time period is expected to be in calendar week 36-42, 2013. Se udbuddet »
2012-12-21   Major overhaul of generator at Avedøre power plant unit 2 (DONG Energy Thermal Power A/S)
Major overhaul of a 565 MVA static excitation generator, including stator core and rotor repair. The scope includes all mechanical and electrical engineering, services and tests. The planned outage for finalizing the scope is 5 weeks. The time period is expected to be in calendar week 26-30, 2013. Se udbuddet »