2019-06-12Contract for Procurement of Gas Pre-Heaters and Gas Filters for Nybro Gas Installation (Energinet TSO Gas A/S)
The Contracting Authority wants to purchase three (3) gas pre-heaters (heat exchange units) and three (3) gas filters incl. commissioning support, spare parts and storage cost in total for installation at Nybro Gas Terminal. The scope is divided into 2 product groups. Each of the 2 product groups (pre-heaters/heat exchanges and gas filters) listed above will be described in separate lot. The technical specification for the gas pre-heaters consist of the following documents:
— Appendix 2A: Data Sheet: …
Se udbuddet »
2018-08-31Certification Services for Baltic Pipe offshore Pipeline (Energinet TSO Gas A/S)
The Contracting Authority wants to purchase offshore pipeline certification of the EPII branch pipeline, the Lillebælt Pipeline and PLEM (Pipeline End Manifold), for the Baltic pipe project. The certification must include verification of all phases from design through manufacturing, installation and commissioning in compliance with DNVGL-ST-F101/DNV-OS-F101-and DNVGL-SE-0475/DNV-OSS-301. Based on this the Baltic pipe project must obtain an unconditional certificate of conformity for the pipelines and …
Se udbuddet » Nævnte leverandører:DNV GL Denmark A/S
2018-07-04Baltic Pipe — Procurement of gas compressors for compressor station Everdrup (Energinet TSO Gas A/S)
The Contracting Authority wishes to purchase natural gas compressors for the Compressor Station located at the South-East coast of Zealand, Denmark. The Compressor Station is referred to as Compressor Station Everdrup (CS Everdrup) and is part of the Baltic Pipe project.
The Baltic Pipe project is connecting the Norwegian gas transmission system Euro Pipe II with the Danish transmission system via a subsea pipeline in the North Sea and connecting the Danish transmission system with the Polish …
Se udbuddet » Nævnte leverandører:Siemens A/S