2013-07-04Establishment of flue gas condensation plant with heat pump on existing waste-to-energy facility (AffaldPlus)
Retrofit of a two step flue gas condensation plant with direct condensation and condensation with a heat pump respectively, at an existing polishing scrubber on a Waste-to-Energy facility.
The Works consists of overall process layout and process calculations, detailed design of rebuilt scrubber, maufacturing and installation of parts, connections to district heat system, commissioning, all controls and electrical systems, flue gas re-heat exchanger and optimised heat pump for the process.
Se udbuddet »